Background
Bundaberg Oral Health operates from the Bundaberg Base Hospital campus in regional Queensland. The facility has 13+ dental chairs and a dedicated Central Sterilising Services Department (CSSD), reprocessing reusable medical devices for general and specialist oral health services and the region’s school dental program.
The CSSD required water treatment system capable of meeting AS 5369:2023 requirements for final rinse water and steriliser feedwater.
The facility also needed to account for Bundaberg’s known flood risk, an important operational consideration for fixed water treatment infrastructure in the region.
Objective
- Provide consistent treated water quality across critical CSSD processes
- Address key incoming water contaminants, including bacterial and endotoxin loads, hardness and dissolved solids
- Build flood resilience into the system design, allowing critical equipment to be relocated at short notice


Challenges
The site’s flood exposure meant a conventional fixed installation wasn’t suitable. The treatment equipment needed to be moved out of harm’s way quickly if flooding threatened the site, without compromising system performance or the practical requirements of a working CSSD.
Solution
Southland Filtration combined two treatment stages in a configuration designed around both water quality and site requirements.
MediaPRO multimedia filtration provided pre-treatment ahead of a compact PuROtherm reverse osmosis unit.
The pre-treatment stage was mounted on a skid with caster wheels and simple disconnection points, allowing it to be quickly disconnected and wheeled to a safe location ahead of a flood warning, then reconnected once conditions allowed.

Outcome
Bundaberg Oral Health now has a treatment system designed to support AS 5369:2023 compliance while giving the facility a practical response to flood events.
The mobile pre-treatment skid provides the flexibility to protect critical equipment when required, without adding complexity to normal CSSD operations.
“The mobile skid gave us the best of both outcomes: full compliance day to day, and the peace of mind that we could pull it out of harm’s way if a flood warning ever came through.” — Jan Lukac, Project Manager, Southland Filtration
In Summary
This project shows how water treatment can be designed to meet strict healthcare requirements while responding to the practical challenges of the site. By factoring in flood risk from the start, Southland Filtration delivered a system that provides the required water quality for everyday CSSD operations, with a mobile pre-treatment stage that can be quickly moved when flood conditions threaten the facility.